Regional Plan: Capital Improvement Plan and Implementation


This phase of the project includes the ultimate planning document associated with the LRGV Regional EAP.  There are six major elements to this phase:

  1. Identification of Projects
  2. Cost Estimates
  3. Prioritization and Ranking of Projects
  4. Identification of Potential Funding Sources
  5. Capital Improvement Plan (CIP) Schedule
  6. Implementation

_____________________________________________________________________________________________________
1.  Identification of Projects.  Each team member will visit their assigned entities and obtain the following thru interview / discussion:
a. Develop list of issues and challenges during and resulting from Hurricanes Dolly and Ike. 
b. Develop list and obtain copies of projects and/or studies.
c. Obtain copies of city and county design standards associated with each entity.
_____________________________________________________________________________________________________
2.  Cost Estimates.  Each team member will review and/or develop cost estimates for each project (for current and future costs).
_____________________________________________________________________________________________________
3.  Prioritization / Ranking.  Each project shall be ranked utilizing the Project Identification / Ranking Form.  Project ranking will be in groups: Small, Medium, and Large.  The current Project Identification / Ranking Form includes: ProjID-Rank2010-9-22.  At this time, the form is being reviewed to modify the following:

  • Under the second goal group, incorporating points for area impacts compared to the local entity's tax base;
  • Under the second goal group, incorporating points for recognizing if the project improves health, safety, and/or quality of life;
  • Under the third goal group, reducing points to accomodate the two above to keep within a 100-point scoring system;
  • Overall, thresholds are being developed for scoring criteria (i.e. -- what equates to 5 points, 7 points, 15 points, etc.).

_____________________________________________________________________________________________________
4.  Identification of Potential Funding Sources.  Potential funding sources will be identified for each project.
_____________________________________________________________________________________________________
5.  Capital Improvement Plan (CIP) Schedule.  A CIP schedule will be prepared based on funding availability and project ranking.
_____________________________________________________________________________________________________
6.  Implementation.  Recommendations will be incorporated regarding implementation and administration strategies.